Bootstrap Thumbnail First

Project title

Prepare an inventory on all Public Infrastructures in Ukhiya & Teknaf Upazila that could be used as cyclone shelter for Emergency preparedness.


Client:

UNDP & ActionAid.

Bootstrap Thumbnail First


Objective:

To prepare an inventory on all Public Infrastructures in Ukhiya & Teknaf Upazila that could be used as cyclone shelter for Emergency preparedness.

Services provided

Secondary Data Collection: secondary data has been be collected from these two upazilas. The information included GIS map of different structure, list of public infrastructures with detail information available and other relevant information.
Conduct field survey with GPS data collection: the research team has been physically visited all public infrastructures and identify those infrastructures (including existing cyclone shelters) who could be used as a shelter during cyclone in Ukhia and Teknaf. A checklist/criterion were developed in consultation with UNDP to collect all required information.
Data validation and analysis: All primary data has been be crosschecked with secondary data and digitized for further use.
GPS data processing and Mapping: GPS data has been processed and linked with other attribute of those data collected during survey. By analyzing GIS data upazila wise map has prepared which showed location of all infrastructure with their types, capacity and conditions.
Reporting: A technical report were prepared by analyzing and result of the survey including Lesson learnt, challenges faced and recommendations will be focused in the report.